LoRa mesh communication
Evaluate how participating devices exchange local team information without depending on cellular data for the radio path.
Tu carrito esta vacío
Seguir comprando¿Tienes una cuenta?
Inicia sesión para finalizar tus compras con mayor rapidez.
J28 · NEXT-GENERATION DEVELOPMENT PROGRAM
J28 is a planned next-generation off-grid communication device direction for professional teams, distributors and product-development partners. It is not presented as a commercially available or certified product.
DEVELOPMENT RENDERING · NOT A PRODUCTION-UNIT PHOTOGRAPH
The J28 program explores a more self-contained smart PTT and LoRa mesh device while preserving the core requirement: local team communication beyond dependable cellular coverage.
The current J25 uses a paired smartphone as the main interface. J28 is being considered as a separate next-generation direction with more selected interaction available from the device itself after initial setup and binding.
Screen workflow, radio configuration, battery, enclosure, accessories, firmware, app dependency, compliance scope and production timing remain development-controlled.
J25 AND J28 ARE SEPARATE PRODUCT PATHS
DEVELOPMENT TARGETS UNDER EVALUATION
These are development targets, not final product specifications or guaranteed functions.
Evaluate how participating devices exchange local team information without depending on cellular data for the radio path.
Determine which PTT, message, location and alert tasks should be available directly from the device.
Define which configuration, map, account or management tasks remain in the companion-phone workflow.
Translate route, terrain, team spacing and shift requirements into measurable prototype acceptance tests.
Align brand, enclosure, packaging, app, firmware, accessories and destination-market needs before design freeze.
Build the verification, field-test, quality and market-document plan around the final configuration—not the rendering.
PROPOSED SYSTEM LOGIC · SUBJECT TO DEVELOPMENT
DEVELOPMENT GATES FOR PROCUREMENT
Destination market, user roles, workflows, environment, team size, volume and customization scope.
Hardware, firmware, interface, radio, battery, enclosure, accessories and development responsibilities.
Functional, radio, power, mechanical, environmental and quality checks against written acceptance criteria.
Real-route testing with the intended team layout, obstacles, movement and operator workflow.
Market-specific testing and documentation matched to the final hardware and radio configuration.
Approved bill of materials, quality plan, packaging, lead time, commercial terms and release decision.
DOCUMENT AND CLAIM BOUNDARIES
The J25 product PDF, FCC ID 2BVP9-J25, FCC grants and J25 reports apply only to their identified model and scope. They must not be used as J28 certification, specification or commercial-readiness evidence.
OFFICIAL DEVELOPMENT RENDERINGS
The images show the current visual direction only. Materials, controls, dimensions and final appearance may change.




HOW A B2B DEVELOPMENT DISCUSSION STARTS
J28 has no public checkout. Any feasibility study, engineering fee, prototype cost, tooling, certification budget or production price must be defined in a written development scope.
No. J28 is presented as a next-generation development program. This page intentionally provides no public price, add-to-cart button or online checkout.
J25 is the current phone-paired LoRa mesh communication product path for sample evaluation and B2B quotation. J28 is a separate development direction exploring more selected interaction from the device itself.
No. They are development targets used to organize buyer requirements. Final functions, hardware, firmware, radio, battery, enclosure, accessories and timing require engineering confirmation.
No. FCC ID 2BVP9-J25 and the public FCC files identify model J25. They must not be represented as J28 authorization or compliance evidence.
A qualified partner can submit market, workflow, volume, branding and technical requirements for feasibility review. Acceptance of a development project depends on scope, resources, timing and commercial alignment.
There is no public J28 price. Feasibility work, prototypes, engineering, tooling, certification and production are quoted only after the written development scope and responsibilities are defined.
DEVELOPMENT INQUIRY
Tell us the destination country, operating environment, required functions, estimated volume and development target.
Product document portal
Use the public product PDF for initial buyer evaluation. Review model-specific certification scope before deployment in a destination market.
Download the English product introduction currently available in Shopify Files.
Download PDF ↓ CERT Model-specific public evidenceReview FCC equipment authorization evidence and the documented battery and transport scope.
Review certification evidence →